Overview
The Heath High School underwent a complete rebuild starting in 2016 to bring their classrooms and facilities up to date and improve their pupil’s experience at school.
With a capacity of 1,250 students, the new school building includes a sports and community centre, activity hall, drama and dance studios, outdoor tennis courts, an amphitheatre and a dining terrace.
The classrooms themselves were also given an uplift to house a sixth form, install specialist laboratories and workshops.
What did we do?
For this project we constructed an access road from the existing school entrance and a car park for 120 cars as well as creating a permeable tarmac multi-use game area with pre-cast concrete edgings.
We also installed an attenuation tank, internal and external drainage and a substation.
Additionally, we laid the foundations with a combination of pad foundations and ground beams, created slabs for the ground, 1st and 2nd floors.
![](https://www.murraywood.com/wp-content/uploads/2022/07/Heath-1.png)
![](https://www.murraywood.com/wp-content/uploads/2022/07/Heath-2.png)
![](https://www.murraywood.com/wp-content/uploads/2022/07/Heath-3.png)
![](https://www.murraywood.com/wp-content/uploads/2022/07/Heath-4.png)
RECOMMENDED POSTS
[.entry-header img.wp-post-image { width: 100%; }]